bifacial, silver frame, BRNO
ATTENTION - due to the size and weight of the panel, it is not possible to unload the car with a hydraulic front. A high lift is always required.
bifacial, silver frame, BRNO
ATTENTION - due to the size and weight of the panel, it is not possible to unload the car with a hydraulic front. A high lift is always required.
680218
1134 mm
2382 mm
1080 mm
1213.2 kg
New
Skladem 60 Item Items
Warning: Last items in stock!
Availability date:
Availability in 37 week
9. 9. - 15. 9.
678 pcs for immediate ordering
Availability in 38 week
16. 9. - 22. 9.
678 pcs for immediate ordering
Availability in 39 week
23. 9. - 29. 9.
678 pcs for immediate ordering
Availability in 40 week
30. 9. - 6. 10.
678 pcs for immediate ordering
Availability in 41 week
7. 10. - 13. 10.
678 pcs for immediate ordering
Availability in 42 week
14. 10. - 20. 10.
678 pcs for immediate ordering
Availability in 43 week
21. 10. - 27. 10.
678 pcs for immediate ordering
Availability by 44 week
from 28. 10. (exact date on request)
678 pcs in stock (immediate dispatch)
bifacial, silver frame
bifacial, silver frame bifacial, silver frame
Availability in 37 week
9. 9. - 15. 9.
On request
Availability in 38 week
16. 9. - 22. 9.
On request
Availability in 39 week
23. 9. - 29. 9.
On request
Availability in 40 week
30. 9. - 6. 10.
On request
Availability in 41 week
7. 10. - 13. 10.
On request
Availability in 42 week
14. 10. - 20. 10.
On request
Availability in 43 week
21. 10. - 27. 10.
On request
Availability by 44 week
from 28. 10. (exact date on request)
On request
Availability in 37 week
9. 9. - 15. 9.
378 pcs for immediate ordering
Availability in 38 week
16. 9. - 22. 9.
378 pcs for immediate ordering
Availability in 39 week
23. 9. - 29. 9.
378 pcs for immediate ordering
Availability in 40 week
30. 9. - 6. 10.
378 pcs for immediate ordering
Availability in 41 week
7. 10. - 13. 10.
378 pcs for immediate ordering
Availability in 42 week
14. 10. - 20. 10.
378 pcs for immediate ordering
Availability in 43 week
21. 10. - 27. 10.
378 pcs in stock (immediate dispatch)
Availability by 44 week
from 28. 10. (exact date on request)
384 pcs for immediate ordering
Tigo CloudConnect Advance Kit including TAP and DIN rail power supply
Availability in 37 week
9. 9. - 15. 9.
3419 pcs in stock (immediate dispatch)
Availability in 38 week
16. 9. - 22. 9.
23419 pcs for immediate ordering
Availability in 39 week
23. 9. - 29. 9.
23419 pcs for immediate ordering
Availability in 40 week
30. 9. - 6. 10.
23419 pcs for immediate ordering
Availability in 41 week
7. 10. - 13. 10.
23419 pcs for immediate ordering
Availability in 42 week
14. 10. - 20. 10.
23419 pcs for immediate ordering
Availability in 43 week
21. 10. - 27. 10.
23419 pcs for immediate ordering
Availability by 44 week
from 28. 10. (exact date on request)
23419 pcs for immediate ordering
PV performance optimization at panel levelTS4-A-O, 15A, 700 W, 1500V UL/IEC, 1.2m output cable length, MC4/EVO2 connector
Availability in 37 week
9. 9. - 15. 9.
566 pcs for immediate ordering
Availability in 38 week
16. 9. - 22. 9.
566 pcs for immediate ordering
Availability in 39 week
23. 9. - 29. 9.
566 pcs for immediate ordering
Availability in 40 week
30. 9. - 6. 10.
566 pcs for immediate ordering
Availability in 41 week
7. 10. - 13. 10.
566 pcs for immediate ordering
Availability in 42 week
14. 10. - 20. 10.
566 pcs for immediate ordering
Availability in 43 week
21. 10. - 27. 10.
566 pcs for immediate ordering
Availability by 44 week
from 28. 10. (exact date on request)
566 pcs in stock (immediate dispatch)
PV performance optimization at panel level, 1.2m output cable length, MC4 connector, wireless communication
Availability in 37 week
9. 9. - 15. 9.
4100 pcs for immediate ordering
Availability in 38 week
16. 9. - 22. 9.
4100 pcs for immediate ordering
Availability in 39 week
23. 9. - 29. 9.
4100 pcs for immediate ordering
Availability in 40 week
30. 9. - 6. 10.
4100 pcs for immediate ordering
Availability in 41 week
7. 10. - 13. 10.
4100 pcs for immediate ordering
Availability in 42 week
14. 10. - 20. 10.
4100 pcs for immediate ordering
Availability in 43 week
21. 10. - 27. 10.
4100 pcs for immediate ordering
Availability by 44 week
from 28. 10. (exact date on request)
4100 pcs in stock (immediate dispatch)
Available in quantities of 100.MC4 compatible.
Availability in 37 week
9. 9. - 15. 9.
9430 pcs in stock (immediate dispatch)
Availability in 38 week
16. 9. - 22. 9.
22030 pcs for immediate ordering
Availability in 39 week
23. 9. - 29. 9.
22030 pcs for immediate ordering
Availability in 40 week
30. 9. - 6. 10.
22030 pcs for immediate ordering
Availability in 41 week
7. 10. - 13. 10.
22030 pcs for immediate ordering
Availability in 42 week
14. 10. - 20. 10.
22030 pcs for immediate ordering
Availability in 43 week
21. 10. - 27. 10.
22030 pcs for immediate ordering
Availability by 44 week
from 28. 10. (exact date on request)
22030 pcs for immediate ordering
PV performance optimization at panel level, 1.2m output cable length, MC4 connector, wireless communication
Availability in 37 week
9. 9. - 15. 9.
130 pcs for immediate ordering
Availability in 38 week
16. 9. - 22. 9.
130 pcs for immediate ordering
Availability in 39 week
23. 9. - 29. 9.
130 pcs for immediate ordering
Availability in 40 week
30. 9. - 6. 10.
130 pcs for immediate ordering
Availability in 41 week
7. 10. - 13. 10.
130 pcs for immediate ordering
Availability in 42 week
14. 10. - 20. 10.
130 pcs for immediate ordering
Availability in 43 week
21. 10. - 27. 10.
130 pcs for immediate ordering
Availability by 44 week
from 28. 10. (exact date on request)
130 pcs in stock (immediate dispatch)
PV performance optimization at panel level, 1.2m output cable length, MC4 connector, wireless communication
Availability in 37 week
9. 9. - 15. 9.
450 pcs for immediate ordering
Availability in 38 week
16. 9. - 22. 9.
450 pcs for immediate ordering
Availability in 39 week
23. 9. - 29. 9.
450 pcs for immediate ordering
Availability in 40 week
30. 9. - 6. 10.
450 pcs for immediate ordering
Availability in 41 week
7. 10. - 13. 10.
450 pcs for immediate ordering
Availability in 42 week
14. 10. - 20. 10.
450 pcs for immediate ordering
Availability in 43 week
21. 10. - 27. 10.
450 pcs in stock (immediate dispatch)
Availability by 44 week
from 28. 10. (exact date on request)
533 pcs for immediate ordering
PV performance optimization at panel level, 1.2m output cable length, MC4 connector, wireless communication